Demo Console

On-Prem Deployment

Runs inside your network boundary (VPC, datacenter, or isolated environment) so critical data never leaves your controlled stack.

Architecture at a glance

Deployment Options

SaaS

Recommended for: Fastest pilot

Private LLM

Recommended for: Balanced control + speed

On-Prem

Recommended for: Regulated / air-gapped

Internet required

Yes

Optional

No

Air-gapped

No

Selective

Yes

GPU control

None

Configurable

Full

Setup speed

Fastest

Moderate

Planned rollout

Compliance fit

General

High

Highest

Before/After: Security Posture

BEFORE

• Shadow IT analysis copies

• No consistent audit trail

• Unknown retention boundaries

AFTER

• RBAC + least-privilege controls

• Exportable audit events

• Isolated network + policy controls

RBAC Audit events Policy controls Isolated network

Pilot Implementation Timeline

Week 1-2

Pilot setup

Week 3-4

Hardening

Week 5-6

Scale rollout

Pilot setup deliverables

• Environment prep

• Connector onboarding

• Security baseline review

Hardening deliverables

• RBAC tuning

• Audit export config

• Guardrail testing

Scale rollout deliverables

• Business unit expansion

• Ops playbook handoff

• Executive reporting cadence

Talk to Security

Design a controlled pilot with your compliance and infra teams.